A method of replacing an existing pipe by filling the pipe with flowable fill to prevent fluid loss and then excavating the entire pipe and surrounding ground with an MTBM for a new installation.
A method of replacing an existing pipe by filling the pipe with flowable fill to prevent fluid loss and then excavating the entire pipe and surrounding ground with an MTBM for a new installation.