A minimum excavation procedure for the construction of pipelines. In collection system re-engineering, moling is typically used as a form of on line replacement, breaking aside the existing sewer fabric and pulling through a new structural lining.
A minimum excavation procedure for the construction of pipelines. In collection system re-engineering, moling is typically used as a form of on line replacement, breaking aside the existing sewer fabric and pulling through a new structural lining.