Field Orders
A written order issued by the engineer clarifies or interprets the contract documents in accordance with the terms of the contract or orders minor changes in the work in accordance with the terms of the contract.
A written order issued by the engineer clarifies or interprets the contract documents in accordance with the terms of the contract or orders minor changes in the work in accordance with the terms of the contract.
GranularTechnical term referring to the uniform size on grains of crystals in rock. material placed around a submarine pipe to facilitate drainage and at the same time strain or prevent the admission of silt or sediment.
A thin layer of clay or polymer from the slurry at the face and perimeter of the formation being excavated. The filter cake is formed through filtrate loss.
The final reduction unit in the drive line.
Portion of a soil finer than a No. 200 (75 mm) US standard sieve.