A rotating drill pipe of larger diameter than the pilot drill pipe and placed around it with its leading edge less far advanced. Its purpose is to provide stiffness to the drilling pipe in order to maintain steering control over long bores, to reduce friction between the drill string and the soil and to facilitate mud circulation. See Directional DrillingA steerable system for the installation of pipes, conduits and cables in a shallow arc using a surface launched drilling rig. Traditionally the term applies to large scale crossings in which a fluid-filled pilot bore is drilled using a fluid-driven motor at the end of a bend-sub, and is then enlarged by a washover pipe and back reamer to the....