NASTT’s CIPP Good Practices Course – Vancouver, BC

10/19/2020


We are pleased to co-sponsor our CIPP Good Practices Course with the Canadian Chapters in conjunction with No-Dig North on October 19 in Vancouver, BC.

Cured-In-Place Pipe (CIPP) technology is an effective trenchless pipeline rehabilitation method that may help to address many of your city’s water and wastewater problems. CIPP is one of the most widely used and accepted pipeline rehabilitation methods. It significantly reduces infiltration and ex-filtration. CIPP is cost-effective and increases flow capacity. And because it is trenchless, traffic congestion and site disruption are significantly reduced.

Date:
October 19, 2020

Time:
8:00am – 5:00pm

Location:
Vancouver Convention Centre | Vancouver, British Columbia

The following NASTT Expert, Volunteer Instructor will teach the course:

Kevin Bainbridge, Infrastructure Management Practice Leader at Robinson Consultants Inc. and Chris Macey, North American Technical Practice Leader for Condition Assessment and Rehabilitation of Pipelines at AECOM.

Visit the No-Dig North conference website for registration information.