After a sewer has been constructed it is checked for conformance to plan specifications. The actual measurements (As-Built) are written on the plan near the original plan measurements. The As-Built measurements are often set-off in a box to differentiate the two measurements. Measurements are of the elevations for the manhole top cover, manhole invert(s) and ground level, for percent grade, etc.