Auger TBM

Tunnel boring machine in which the excavated soil is removed to the drive shaft by auger flights passing through the product pipeline pushed in behind the TBM.

Available Water

Water necessary for the performance of work, which may be taken from the fire hydrant nearest the worksite, given conditions of traffic and terrain which are compatible with the use of the hydrant for performance of work.

AWWA

American Water Works Association