Northwest Technical Luncheon – Edmonton, AB
Date: Thursday, January 23
Time: 11:30 AM – 1:30 PM
Location: University Club of the University of Alberta 11435 Saskatchewan Dr, Edmonton, AB T6G 2G9
Cost: Free for Members | $20 for Non-Members**
The Trans Mountain Expansion Project, constructed between 2019 and 2024, incorporated over 550 trenchless crossings in varying terrain from central Alberta to British Columbia’s lower mainland. While most of the major crossings were completed using one-pass methodologies such as horizontal directional drills, two-pass microtunneling was used in select locations to tackle some unique challenges on the project. This presentation will cover several completed two-pass tunnels for high pressure pipelines ranging in length from ~120 m to 240 m in a wide range of geological and hydrogeological conditions, while crossing highways, railways, and environmentally sensitive areas.
Presenter: Jake Fei, EIT and Project Coordinator, Stantec
Jake is a Civil EIT and project coordinator with Stantec’s water conveyance group in Edmonton helping clients deliver multi-disciplinary projects. Jake specializes in trenchless design and construction for new installations and rehabilitation projects across Canada and the United States. He dedicated over three years of his career to the Trans Mountain Expansion Project, gaining a wealth of knowledge in trenchless construction where he helped to coordinate and conduct design review of over 50 major and 50 minor trenchless crossings.”