Muck
Spoils or removal of same.
Spoils or removal of same.
A brick sewer that consists of three or more layers of bricks.
To plan and undertake projects with regard to a phased/milestone schedule.
The number of blows per foot required to drive a standard penetration test (SPT) soil sampler into the ground during geotechnical exploration. The N-value is often used to estimate in situ consistency of clays and silts and relative density of sands.
Method of excavation of a trench up to 100mm wider than the outside diameter of the service to be installed, usually employing either a rockwheel or chain type trencher.