Join us for a Holiday Mixer and an educational presentation on HDD design and execution at Toronto Pearson Airport.
The Pearson Airport project involved planning and execution for 1.7km of new NPS 12 and NPS 20 pipeline infrastructure within the heavily congested Pearson Airport corridor. To minimize surface disruption and accommodate the operational constraints of a major international airport, Horizontal Directional Drilling (HDD) was utilized for the majority of the installation including three HDD crossing locations: Airport Road, Jetline Road, and the Tank Farm. FSM Group, Teng & Associates, CCI Inc., and R.B. Somerville Co. Limited (RBS) worked collaboratively throughout the design and construction phases to develop crossing solutions that balanced technical feasibility, constructability, and operational constraints.
The project required the integration of trenchless engineering and pipeline engineering disciplines to develop designs that were not only technically feasible but also constructible within limited workspaces in a highly constrained operating environment. The design process included crossing geometry development, stress analysis, annular pressure management, steering specifications, workspace evaluations, and constructability reviews. Construction planning was incorporated throughout the design process to evaluate equipment requirements, pullback sequencing, access restrictions, and contingency measures.
This presentation examines how construction planning was embedded within the design process and how those plans translated into successful field execution. Drawing on design documents, execution plans, and daily construction reports, the presentation follows the progression from mobilization through pullback and tie-in activities. Focus is placed on the collaboration between engineering and construction teams and its role in managing risk, maintaining constructability, and supporting successful trenchless installations.
Presenter: Chelsea Griffiths, P.Eng., P.E.,
Chelsea Griffiths, P.Eng., P.E., is the Trenchless Engineering Manager for CCI Inc., leading the delivery of trenchless engineering projects across Canada and the United States. With more than 12 years of experience in the pipeline and trenchless industry, Chelsea has designed and managed a wide range of complex municipal, energy, and oil and gas infrastructure projects. Her experience includes HDD, conventional bores, direct pipe, and other trenchless installation methods, as well as multidisciplinary project management and construction support. Chelsea holds a Bachelor of Science in Engineering from the University of Calgary and is registered as a Professional Engineer in British Columbia, Alberta, Saskatchewan, Ontario, Newfoundland and Labrador, and Texas.
Ron Jensen, MBA, is the Senior Construction Manager for CCI Inc., providing leadership and oversight for trenchless construction projects across Canada and the United States. With more than 20 years of experience in trenchless technology, Ron has contributed to a wide range of projects, from small diameter fiber optic installations to technically demanding pipeline crossings. His career has taken him across Canada, Europe, and the United States, progressing through field and leadership role. In his current role, Ron leads a team of HDD inspectors, coordinates with multidisciplinary teams and project stakeholders, and provides strategic oversight of complex trenchless operations to
Justin Pommerville, P.Eng., is the Manager of HDD for Robert B. Somerville Co. Limited, leading the management, planning, and execution of pipeline and horizontal directional drilling (HDD) projects, including design-build projects across Canada. With 15 years of industry experience, Justin has delivered complex projects and capital programs across energy, mining, utilities, industrial, and nuclear sectors. Justin holds a Bachelor of Engineering Science from the University of Western Ontario, is an Executive MBA candidate at the University of Calgary, and is registered as a Professor.

Join us for an educational luncheon on the microtunnelling methods currently being used on the Lauderdale New Storm Trunk and Sanitary Trunk.
Lauderdale New Storm Trunk and Sanitary Trunk are under construction using microtunneling methods. The two TBMs are using the same working shaft. This presentation will introduce the project background, challenges, and the cooperation between owner and contractor on addressing the challenges through delegated design model.
Presenter: Chaoshi Hu, PhD, P.Eng,
Chaoshi Hu, PhD, P.Eng, is a structural engineer with EPCOR Water Services. He has 16 years’ experience in the design and construction of underground infrastructures; has designed and constructed 16 kilometers of drainage tunnels, and over 60 deep shafts. Delivered over $400M underground infrastructure projects.
He is volunteering in NASTT-NW Chapter as vice president. He has authored three papers at NASTT No-Dig Conference and WWC Conference.
Peiqian (Jan) Zheng, project manager with Shanghai Construction Group (Canada). Jan has over 10 years’ experience in underground and TBM/MTBM tunneling construction. And Jan has successfully delivered multiple drainage infrastructure projects for EPCOR.

Join us for an educational luncheon on a Case Study in Close-Fit Spiral-Wound Lining.
Large-diameter sewer rehabilitation projects often present a combination of structural, hydraulic and constructability challenges that cannot be addressed through technology selection alone. Access limitations, existing pipe geometry, flow management, site constraints and long-term performance requirements can all influence the most appropriate rehabilitation approach.
Using the City of Portland’s Carolina Trunk Sewer rehabilitation as a case study, this presentation will examine the evaluation and application of close-fit PVC spiral-wound lining technology for a challenging large-diameter gravity sewer. The discussion will focus on how project-specific conditions informed rehabilitation selection, the relationship between design requirements and field constructability, and lessons carried through installation and verification.
The presentation will conclude by considering how these decision-making principles may translate to large-diameter sewer rehabilitation in Edmonton and across Alberta, and where spiral-wound lining may fit within the broader trenchless rehabilitation toolbox available to owners, engineers and contractors.
Presenter: Brett Taylor, infraStruct Products & Services

The NASTT Northeast Regional Chapter is pleased to present our upcoming Northeast Chapter 2026 Trenchless Conference, taking place on November 9th-10th, 2026 in Saratoga Springs, NY. This event brings together professionals from across the trenchless technology industry for an engaging and educational experience.
Join us for a dynamic program that includes technical presentations, training courses, exhibitor showcases, and networking opportunities. Designed for engineers, contractors, suppliers, manufacturers, and other industry stakeholders, this event will explore current challenges, emerging trends, and proven solutions in the trenchless field.
Key Highlights Include:
- Latest Trenchless Technologies & Methods
- Inspection, Leak Detection, and Asset Management Strategies
- Rehabilitation Techniques and Best Practices
- Regulatory Frameworks and Upcoming Standards
- Case Studies from Local and Regional Projects
- Opportunities to Network with Industry Leaders
Social Mixer
There will be a social mixer at The Whitman from 6:00 PM to 9:00 PM on November 9, 2026 for attendees of this event. This will provide an opportunity for registrants to socialize and network in a more relax setting.
Who Should Attend:
This event welcomes NASTT members, non-members, students, and all trenchless technology enthusiasts interested in gaining insight, fostering connections, and advancing their work through knowledge-sharing and collaboration.
Don’t miss this opportunity to learn from the best, expand your network, and stay informed on the evolving trenchless landscape!

Keep the No-Dig North connection going! Join fellow trenchless professionals from Ontario, Quebec, and the Atlantic Providences for a relaxed evening of Networking, conversations, and fun at GRETA Bar in Calgary, AB.
Free for GLSLA Regional Members and 2026 No-Dig North attendees. Please pre-register via the GLSLA LinkedIn event.