First Pilot Tube Guided Boring Project Completed in Mexico City
In mid-October 2013, construction was finalized on the installation of 2,944 ft. (897m) of new 36-in. (914mm) ID storm and sanitary pipelines using pilot tube guided boring methods in Mexico City. The Subcolector San Marcos project, owned by La Comisión del Agua del...
Osceola Parkway-Florida Turnpike Crossing, Orlando, Florida
The TOHO Water Authority (TOHO) has been acquiring and integrating water utility systems in Osceola County near Orlando, FL. As part of that growth, a 24-inch interconnect in Kissimmee, FL was required to provide adequate redundancy in the system. The route of the...